Quote:
Originally Posted by JL1RX7
More details on the such.... Let me know what time.
|
Most likely starting up work around noon on Saturday. I just finished cutting up the mounting bracket for the fuel filter and I'll be measuring out the -8 lines tonight. Tomorrow I'll get all the fuel lines in the engine bay measured out and cut. Ideally all we'll need to do on Saturday is double check the fuel lines to make sure they won't leak then finish putting the engine bay all together.
I'm hoping/thinking that shouldn't take more than a couple hours :fingers_crossed: :knock_on_wood:
Quote:
Originally Posted by WE3RX7
I'm wrapping up the rx8 and the daytona 24 hours is running at 3pm on speed.... I'll be with you all in spirit. That and we're on "baby watch" as the wife already had false labor once this week so we're all on pins and needles now, lol...
|
Oh, wow! I didn't realize she was about to pop. Staying at home def takes precedence over swinging by here. Though... If all goes to plan maybe Brian and I can swing by in the FD for a few on Sunday