|
Welcome to Rotary Car Club. You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today! If you have any problems with the registration process or your account login, please contact contact us. |
|
Thread Tools | Display Modes |
|
11-20-2013, 11:37 PM | #1 | ||||
Still Building my FD
|
IRP Oil Filler Neck Group Buy - Filling a Void in the Market
Quote:
Here at IR Performance, we have an exciting announcement to make-- we are running an introductory Group Buy on our newest performance product for the Rotary Community: The IRP Stainless Steel Oil Filler Neck! Catering to the single turbo owners and road race/track junkies, this product has the following features: Quote:
-All 304 Stainless Steel construction -Butt welded fittings and neck, TIG welded -Choice between dual –6 ports or a single –10 port to run to catch can and/or compressor inlet (straight thread o-ring seal) -Custom machined flange that works as a baffle while not restricting filling -Made in the U.S.A. by rotary enthusiasts -Works with stock and aftermarket oil caps -Fits with GZ/Excessive LIM as well as stock -No modifications needed, bolt on and go -Includes sealing o-ring and mounting hardware -Retail price is set at $245, but right now we are offering this product at $195 plus shipping Quote:
To suit your specific application you are responsible for sourcing your own AN fittings. We can arrange to have the oil filler necks powder or ceramic coated on a case by case basis as well. More pictures and details to follow Quote:
Here it is with a couple different aftermarket oil caps:
__________________
Uh.... hi. |
||||
11-21-2013, 11:06 AM | #3 |
Still Building my FD
|
And a couple pictures of the fitment of the flange. This is the part I am most proud of.
And the flange with built in baffle. It is rotated to align with the engine.
__________________
Uh.... hi. |
11-22-2013, 12:58 PM | #5 |
Still Building my FD
|
That was fast! Thanks! Just so everyone knows, I am still making these and my initial costs at running only 10-15 units would have been over what IRP is offering them at right now. They backed this project so we could do a much larger quantity (of which an unemployed man like me could not afford to front) to bring the costs down.
The flanges are custom The neck piece is custom The dual port pieces are custom The single -10 ports are custom. The pipe and 90 degree fittings are the only part that we didn't make. (and the O-ring and bolts too of course) So basically, this is as far from off the shelf as a piece can get. I am very happy with how they turned out.
__________________
Uh.... hi. |
11-30-2013, 02:04 PM | #11 |
Still Building my FD
|
Ok, quick update time. It's been crazy with Thanksgiving and all.
So there is going to have to be a choice made for those wanting the single -10 fitting. The front lifting eye is in the way and will need to be removed, and the -10 port will be facing forward. There is just no other good way to put a -10 fitting in there without requiring different modifications. Otherwise, the dual port will be facing inwards as per the original pictures. and not require removal of the front lifting eye. I will be contacting everyone who has the single -10 selected to assure they know that this piece will require the lifting eye removed. Oh, and pending those responses, there should be more fitment pics coming soon. I am sure everyone is wanting to get their hands on one as soon as possible.
__________________
Uh.... hi. |
12-05-2013, 11:12 PM | #12 |
Still Building my FD
|
Final pieces for fitment are on their way to IRP. Once they are blessed off, then final production and shipping for those involved in the group buy begins.
__________________
Uh.... hi. |
12-14-2013, 01:27 AM | #13 |
Still Building my FD
|
Progress! Final production is almost commencing. Just have to finalize fitment with different lower and elbow combinations.
Dual -6 with stock lower: Dual -6 with Xcessive lower:
__________________
Uh.... hi. |
12-14-2013, 01:34 AM | #14 |
Still Building my FD
|
Single -10 with stock lower:
Single -10 with Xcessive lower: These ended up being a complete redesign from what is out there. Jut waiting on final fit checks with various lower/elbow combinations to determine if there will need to be two separate units for the stock lower and for the Xcessive lower. Hope you guys like them! Final production should be starting soon!!! -Nathan
__________________
Uh.... hi. |