well, i have started to work on the car again that the rack is going into. i was playing with wiring harnesses the other day and a koyo radiator should be on its way shortly...
i hope to be looking to pick up parts of my ignition system within the next 2 wks and seeing when i can get my coils...
my goal is to have the engine out within the month...and then have two FDs with empty engine bays in my driveway!
__________________
WNC Tour Guide - Including the Tail of the Dragon - PM for details
|