Quote:
Originally Posted by FerociousP
Good updates. Can't wait to see this thing driving.
|
You and I both. Been working a lot lately, and the brake hose issue threw me a little off. Still waiting on that strut tool to be made!
Once the struts are done, here is the list to do in order:
Reinstall front struts
Install new front brake hoses and pads
Install new sway bar links
Install fuel tank
Install new fuel pump
Install new clutch slave and master cylinder
Install transmission
Install engine
Install radiator/oil cooler
Install new rad hoses and stuff
Bleed all the brake and clutch hydros
Fill differential with fluid
Fill transmission with fluid
Fill engine with oil
Fill engine/rad with coolant
Reinstall headlights, taillights, associated trim
Find and install a muffler (this one is roached)
Really, nothing there is hard, or time consuming. The 'hardest' part is probably all the trim installation.
The first week on April (6th-12th), with wife and kid will be out of town. I still have to work, but I will have more time to work on it. Also, Sundays are free, so I can get stuff done then as well.
If any of my local peeps want to help, feel free to text me.