Quote:
	
	
		
			
				
					Originally Posted by  djmtsu
					 
				 
				Well, some things just got added to the list. 
 
1) install new door belt line seals DONE 
2) install Tokico D-Spec struts with Tein S-Techs  DONE 
3) install Agency Power sway bars and end links  DONE
  
			
		 | 
	
	
 Plus-
4) Installed front splash/mud guards
5) Installed RE-Amemiya Super Dolphin Tip catback
Only this left is to get my tires flipped to my 2010 RX-8 wheels and an alignment.  Both of which should happen this weekend 

  This pic was mid tear down.  I'll post a completed photo once the wheels are on.