View Single Post
Old 01-07-2010, 04:15 AM   #1
probedb
The Newbie
 
Join Date: Dec 2009
Location: Sheffield, UK
Posts: 28
Rep Power: 0
probedb is on a distinguished road
Quote:
Originally Posted by 3RotorMotor View Post
Not sure how I missed it. We placed an order for 16 sets of housings which left around 8 extras (4 of which have sold already). They are coming by boat from Taiwan, and the estimated time frame is between 1-1.5 months for them to get to us (give or take). If you would like one of the remaining 4 let me know.

To everyone else waiting on lights... if you are #23 or below we are currently still working on them but getting very close. We have about half done. We'll post an update as soon as we have the last ones finished and then send tracking numbers. If you are later in the list please bear with us as we are simply waiting on the shipment from taiwan to arrive. -Heath
Dropped you an email Cheers!
__________________
last.fm
A'Pexi Power FC, HKS Twin Power, HKS Racing Suction Intakes, SMB stainless exhaust and downpipe, Dragon silenced midpipe, Efini y-pipe
Mapping by Hayward Rotary
Car pictures
probedb is offline   Reply With Quote